The facility is a conventional masonry and timber structure with hollow core concrete plank flooring and timber second floor walls and roof. The special structural features of the building are the exposed detailing of the canopy, with many fully hidden connections and the reinforced masonry walls of the full depth basement.
Project value was approximately 8 million. For Carson Woods Architects Limited