The column is a perforated steel tube 30 m high, mounted on a structural slab. The structural challenge was the requirement for precisely located and sized openings, durable detailing of the glass components, aesthetic requirements at the base and splice and the strength design of the fiberglass and steel woodpecker units
Project value was approximately $70,000. For Fastwurms